Scaffold Fittings

Scaffolding Division Scaffold Fittings

Double Coupler D/F EN 74-1B

Weight 0.960 Kg (960gm)
Finish Galvanized
Type of Load Slip along a tube
Minimum Slip Load 10 KN
Maximum Slip Load 15 KN
Maximum Distortion 32 KN
Safe Working Load 9.4 KN
Maximum Tension Load 18.80 KN

Swivel Coupler D/F EN 74-1A

Weight 1.10 Kg
Finish Galvanized
Type of Load Slip along a tube
Maximum Slip Load 09.50 KN
Maximum Distortion 19.00 KN
Safe Working Load 5.30 KN

Single (Putlog) Coupler D/F BS1139

Weight 0.630 Kg (630 gm)
Finish Galvanized
Type of Load Force full the tube axially out of the coupler
Maximum Slip Load 1.60 KN
Safe Working Load 0.53 KN

Girder Coupler/Beam Clamp D/F AS1576 Use in Toe Board Clamp pairs (In accordance with BS1139 Part 2 1982)

Weight 1.50 Kg
Finish Galvanized
Maximum Distortion Load Vertical 32.00 KN
Maximum Distortion Load Horizontal 11.50 KN
Maximum Slip Load 06.00 KN
Minimum Load bearing Capacity 10.00 KN

Joint Pin (Pressed)

Weight 0.84 Kg
Maximum Slip Load 6.00 KN
Maximum Tensile Load 7.80 KN
Maximum Bending Load 19.00 KN
Finish Plated, Gold Passivated or Powder Coated

Sleeve Coupler Pressed EN 74-1B (In accordance with BS1139 Part 2 Sec 2.1 1991/EN74 1988)

Weight 1.00 Kg
Finish Galvanized
Maximum Tensile Load 7.80 KN
Maximum Bend Load 21.00KN
Maximum Displacement 5.00mm
Maximum Load Bearing Capacity 19.00 KN

Ladder Clamp Pressed

This is a unique safety product that enables a ladder to be firmly Fastened by the stiles to horizontal scaffold tubes or posts. Used in pairs

Staircase Coupler Pressed

The stair case coupler is used for the construction of make shift stairways by connecting together scaffold tubes and timbers (often scaffold boards) in angles varying from 28°to 90°. These units can be used in either left of right hand combination.

Toe Board Clamp

Weight 0.32 Kg
Finish Galvanized

Board Retaining Clamp

  • Conforms to BS EN 1139: Section 2.2. 1991
  • Silver or gold zinc plated finish
  • Used for securing scaffold boards

The board retaining clamp is used to secure scaffolding boards. Board retaining clamps ensures that scaffolding boards are carefully and safely locked in to the correct position for a safe work environment.

Get in touch with us today

At Adka General Contracting Co. LLC., we turn visions into reality. With a focus on quality, innovation, and client satisfaction, we're your trusted partner in building the future. Contact us to create extraordinary spaces together.